Results 1 to 25 of 317

Thread: Project Illuminated - XtremeSystems Tribute

Threaded View

  1. #10
    Xtreme Member
    Join Date
    Aug 2008
    Location
    Wellington, New Zealand
    Posts
    356
    Quote Originally Posted by exemay View Post
    why not run a third pump?? well, u can give it a go, im just not entirely sure u would get that much of a benefit from putting a third in there!

    if u have a spare u could go for PUMP>RAD>RAD>RAD>RES>PUMP>PUMP

    so that you get the pressure up going into the radiator!
    I like that idea... I will shortly have 5 D5s... two as hot spares as I detailed a bit in previous posts (for "unnecessary" redundancy and experimentation's sake)

    Quote Originally Posted by YMAA View Post
    If the rig is planned to run 24/7, then you will get no temperature gain whatsoever from adding more water to the loop. The water will (eventually) reach equilibrium just the same as if you had a T-line and no res. If you only run the machine for a few hours out of the day, then yeah, you might see gain from a huge res. But if you have the multiple loops running into and out of the same massive res, it no longer becomes a dual-loop system, just a single loop with a whole bunch of pumps.
    Hmmm, yes it will reach an equilibrium but with more volume for heat to diffuse thus surface area to escape I question whether that equilibrium would be less so to a non-negligible extent.

    Quote Originally Posted by SNiiPE_DoGG View Post
    yes see I presumed you had drawn the diagrams incorrectly in the picture earlier on but that is not the case. My apologies

    still I say just use two pumps in series for the GPUs and you will have more than enough redundancy as long as you monitor them frequently enough.
    The redundancy is just for fun... doing something I've never done, etc. Plus I've already completed 90% of the controller schematic... just looking for some electrically pneumatic ball valves I can mod into the loop as failure point diversions.

    A closer look at the bitspower top/bottom/front.


    Last edited by xaxis; 02-02-2011 at 10:35 AM.
    Agenda: I have 0 projects prioritized for the year, 0 in progress this month, 0 this week, and 0 as of this moment.

    Current primary function: traveling.

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •