Yes, I had a thorough consultation with the staff http://www.xtremesystems.org/forums/...d.php?t=267764
and the parallel idea was dropped in the grease!
Route both VC cables up and behind the MB
Route VC cables, one up and behind and one down through midplate
Route them both down through the midplate
Route the top cable behind the RES and the lower down through the midplate
Other, please explain
Yes, I had a thorough consultation with the staff http://www.xtremesystems.org/forums/...d.php?t=267764
and the parallel idea was dropped in the grease!
Victory May Be Fleeting, But Obscurity Lasts Forever!
Last Project http://www.xtremesystems.org/forums/...d.php?t=213829
Canceled Project http://www.xtremesystems.org/forums/...d.php?t=265292
New Project http://www.xtremesystems.org/forums/...d.php?t=269440
Bookmarks