This really shouldn't have been too difficult to understand.
Quote Originally Posted by Shingoshi View Post
I really can't do anything else without having that case. I have to map out the placement of the components I want to use. I'm trying to build the system with as little tubing in it as possible. I can achieve that by directly connecting as many of the components together. Only using tubing if absolutely necessary.
Think about it for a moment. I really don't have that much space to work with. It may seem like a lot. But I know from my experience with packing luggage, I'm going to have a lot of work ahead of me consolidating as much as I can.

My reservoirs are going to consume a lot of space on their own. I'm going to need to pack many things around them to capitalize on all the available space. I need to pack this as densely as humanly possible. I'm thinking that if I assemble everything outside of the case first, and then install the components as integrated units, much of the work can be reduced. I will likely remove the mounts for the pump and let it simply hang on the injector. The only concern there is whether the injector can support the weight. Most of my waking hours are spent thinking about this project. So yes. I know exactly how difficult it's going to be.

Shingoshi