This is a cascade i've been building for a month or two (on and off, mostly off due to € shortage), it's main purpose will be dual-core benching, those small compressors are too weak to cool anything hotter anyway. All components are brand new except for the oil sep which i got dirt cheap on eBay.
As the project went on i was forced to buy myself my own equipment which took me some time since my budget doesn't stretch as i would like.
High temperature stage:
- compressor: Danfoss NL11F (1/3HP)
- condensor: Empor 0.72kW (200mm, three-row) + 10W 220Vac motor + 200mm fan blade
- filter/drier: Castel 20g /w service port
- refrigerant: R-507
- metering device: TC-28 (0.7mm ID) capilarity tube
Interstage heat exchanger:
- 10-plate stainless steel (rated up to 5kW water-water)
Low temperature stage:
- compressor: Danfoss NL11F (1/3HP)
- desuperheater / oil cooler: Empor 0.72kW (230mm, one-row) + 10W 220Vac motor + 230mm fan blade
- oil separator: Danfoss OUB-1 (floated)
- filter/drier: Danfoss 40g copper
- refrigerant: R-1150 - ethene / ethylene
- metering device: TC-31 (0.8mm ID) capilarity tube
- 2m stainless steel flexible suction line
- evaporator: tiborrr's Maze GT1 EE (extreme edition)
Safety:
- Ranco high pressure cut-off @ 27bar (on low temperature stage)
- 2x high pressure bourdon type pressure gauge Wigam
- Fach 0.9L receiver to act as an expansion tank 0.9L on low temp. stage
Initial preparations - lining up the component on a mock-up board:
![]()
![]()
Backbone of this cascade - 3mm steel plate:
The evaporator / suction line / safety - HPCO:
![]()
![]()
![]()
Manual hot gas bypass (to compressor, not into evaporator) - ball valve:
![]()
Temperature monitoring - K-types & Voltcraft K102 K-type thermometer:
![]()
Interstage heat-exchanger enclosure is made out of scrap wood - three major plates are 5mm, rest is 2mm:
![]()
![]()
Brazing the first stage:
![]()
![]()
![]()
![]()
First frost on first stage @ ~ -43°C:
![]()
![]()
![]()
Insulated with poliurethane foam (great specs, temperature conductivity ~ 0.039W/mK, neoprene has 0.036W/mK) it does ~ -53°C:
![]()
Ran out of oxygene to complete the second stage. Will continue the next weekend as i am away from home during the week.
Best regards,
Niko![]()


































Reply With Quote
on the sec stage








...







So the charging will have to wait for next weekend as I am again away from home from monday to friday. All threaded joints are secured with appropriate amount of LeakLock sealant so there shouldn't be any leakage on the second stage now. Also I will have to buy some more of this armaflex self-adhesive tape.







Bookmarks