If it were me, I'd whip up some round rods (8 to be precise) of the proper spacing length that had 6-32 right and left hand threads and thread them into the rads. Seeing you unlikely have the same equipment I have (lathe), maybe go for some reasonably thick sheet metal (perhaps 18ga) strips bent to the proper distance and screwed into place?,. . .or maybe even use 2 full set of UN's rad brackets to hold the rads together? Heck, if you use 3 sets, you might even be able to provide a method to mount the pumps with a UN pump mount as well.
![]()
Bookmarks