Eventually, yes.
Full spec'ed and full speed? No.
6months after release? Maybe, most likely longer.
32/28nm shrink needed? Possibly.
Those are all guesses. Full spec and speed should very well be possible if TDP is similar to the GTX285 (which it should be).
6+ months is not going to be the case IMO. There will be no need for a shrink if TDP is similar to the 285.
Asus Rampage II Gene | Core i7 920 | 6*2GB Mushkin 998729 | BFG GTX280 OCX | Auzentech X-Fi Forte | Corsair VX550 —Life is too short to be bound by the moral, ethical and legal constraints imposed on us by modern day society.
Bookmarks