Results 1 to 25 of 61

Thread: Huge Radiators: Roundup

Threaded View

  1. #18
    Chasing After Diety
    Join Date
    Jan 2007
    Location
    Absolutely Speachless :O
    Posts
    11,930
    Quote Originally Posted by HESmelaugh View Post

    Each test run lasts 35 minutes, 25 minutes are warm up and the data from the last 10 minutes is all averaged out.

    Hes i hate to do this to ya... but i dont think you had enough warmup time.. Expecially on those large rads...

    Courtesy of martin:
    Quote Originally Posted by Martinm210 View Post
    The problem with delta T testing I see is how long it can take to stabilize the run at high deltas and high heat loads with large volumes. I'm seeing some tests taking over 90 minutes to stabilize.

    So much for production testing..lol!....
    Sorry bro, you need 90 min on average, or your just testing inital hold capacity and not disapation. You need a much longer warm up sequence...

    Skinnee had simular results when dealing with full copper rads.. Your warm up time is just too small.

    and as u guys can see its a logrithmic at the start so you cant do a straight liner eq.
    Last edited by NaeKuh; 06-06-2009 at 01:03 PM.
    Nadeshiko: i7 990 12GB DDR3 eVGA Classified *In Testing... Jealous? *
    Miyuki: W3580 6GB DDR3 P6T-Dlx
    Lind: Dual Gainestown 3.07
    Sammy: Dual Yonah Sossoman cheerleader. *Sammy-> Lind.*

    [12:37] skinnee: quit helping me procrastinate block reviews, you asshat. :p
    [12:38] Naekuh: i love watching u get the firing squad on XS
    Its my fault.. and no im not sorry about it either.

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •