Thank You!
I did all my wire extensions, and sleeving today for better cable management. Going to try and conceal as many wire as possible. This case needs LONG wires! LOL.
BTW i will probly mount my HDD's like you did. Thanks for the great idea.
LOL Yeah i has worried but it worked out great, besides i have a spare with no window, so if I screwed it up the first time I would have a second chance and then buy a panel with a window.
It helps when I have been in the construction trade for 15 Years. Learned somethings over time.
That is the way I will end up doing it. Have the pump before the block. maybe make that fitting into a 90deg. leading to the res/pump.
One 90 deg. will not so bad? I mean it will be before the res/pump so all the pressure will be before the block? Or am I wrong?
Same thoughts here when I was drilling it .





Reply With Quote
Bookmarks