Quote Originally Posted by terrace215 View Post
Llano taped out in Q4 2009, and is due to ship in H1 2011.

BD taped out in Q2 2010, on the same process, but a more complex design, larger die, more difficult to yield, and requires more validation (at least for the server parts).

BD isn't going to ship in Q2 2011.
I'm sure that AMD has separate engineering teams working on these obviously very different chips. Do you honestly believe that you can make predictions about one based on the other?