Like the 1 block concept and agree with WL that if everything is cooled that should be then this will replace my BP just to reduce loop tubing.
Good concept EK, what time line are we looking at for availability?
Like the 1 block concept and agree with WL that if everything is cooled that should be then this will replace my BP just to reduce loop tubing.
Good concept EK, what time line are we looking at for availability?
Bookmarks