-
And finally the last of em
This is where I'm at, need to pressure test 1st stage and flush out all the oil in the rotary and change to POE, then it'll be time to charge. Second stage has a few minor things, filter-drier needs to be brazed in, cap tube needs to be cut to length, and then compressor needs to be tied in. Then all the wiring needs to be done, i already cut in the suction line holes in the top of the case and ill cut a 120mm hole in the one side for the desuperheater to suck in fresh air. More to come!
Last edited by Sneil; 12-15-2007 at 08:41 PM.
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
Bookmarks