Quote Originally Posted by RLM View Post
Don't agree with that. Looking at your table, volts required etc, and my own 'B' they seem about on par with the L726A's.

RLM
Then you need to and look again. The A batches are requiring less voltage than yours and are running faster. Volt for volt the A's are getting higher than the B's