Interesting. The timed workload MWI function are related to 226 & 227. It looks like the X25-E has these attributes, although they are not labelled as such. If they are timed workload attributes it would be easy to calculate how long it would take to deplete the P/E cycles.

IF Intel bring out a SF based drive presumably it will also have the timed workload function.