Depending on the specifics of the NDA, you are allowed with in the contract to say a certain amount. Specifics like everything you're asking, pretty much a no-no. Saying something like "Yea, production sample A vs Pre-production D yield the same results", well that's a bit vague and doesn't exactly reveal much. Not to say it ISN'T in the NDA as something that can't be talked about though. *shrug*
Which is where you'd want to do it at, along with DDR3-1866 if at all possible, too. I mean, if you really want to remove all variables.
Bookmarks