Thanks Oranuro
Here is Update 10
My first set of copper pipes are ready.^^
And they fit perfect i also placed the PSU on its place to loot at the cable management.
Here are some pictures.
I placed the old Motherboard on the tray so i can place my HD 6970 to fit the pipes.
Taking care of the HD 6970 so i can place the water block on it.
When i removed the stock cooler is saw this on the power connector.
The first 2 pipes are ready :p
Then i also checked for the power cables and it looks pretty good.
Now i need to wait for my order from Highflow so i can finish my loop with copper pipes.
Sponsored by Highflow
Completed Builds
Project Umbrella
Black Obsession
Bookmarks