We are working on pre-installed metal standoffs.
Should be ready in about 3-4 weeks for all products.
We are working on pre-installed metal standoffs.
Should be ready in about 3-4 weeks for all products.
Originally Posted by creidiki
Eddy correct me if im wrong, but isnt that cross milling marks?
Wasnt it shown a while back cross milling was OK when DD did it and it had no adverse effect on the block?
Meaning yeah.. i take your side on it... its OK Performance wise...
Can u feel any uneven surfaces on that block?
Nadeshiko: i7 990 12GB DDR3 eVGA Classified *In Testing... Jealous?*
Miyuki: W3580 6GB DDR3 P6T-Dlx
Lind: Dual Gainestown 3.07
Sammy: Dual Yonah Sossoman cheerleader. *Sammy-> Lind.*
Its my fault.. and no im not sorry about it either.[12:37] skinnee: quit helping me procrastinate block reviews, you asshat. :p
[12:38] Naekuh: i love watching u get the firing squad on XS
Bookmarks