Quote Originally Posted by SpuTnicK View Post
The Q4 2011 is not Ivy Bridge, it is High-end Sandy Bridge (LGA 2011) AFAIK.
Ivy Bridge is planned for H1 2012

I dont know man...I think, maybe it will be IB. Some ES SB (around 2.2 GHz) at LGA2011 are, but 130TDP with 16 threads and high clocks doesnt looks so real....32nm is for this too big think.