Okay, so heres what I want on water:
i7-950
2x evga gtx460 1gb's
If i dont modify my 800D, then Im thinkin one loop, single tfc 3x120mm rad on top. Im just worried about my order of flow. I was gonna run both the vid cards with the ek blocks that use the sli bridge for a clean parallel flow. Should I go rad > cpu > vid cards > pump? or would I be better off with stacking 2 switech mcr 320 qp's? in which case ide go rad > cpu > rad > vid cards > pump
thnx
Bookmarks