yes before I have to make sure that my tubing routing is ok, and I don't think so because I'll maybe modify the reservoir, and the pump setup. I think i have to wait for the final tubing setup. I'm waiting some parts from Aquacomputer since 2 weeks now... they shipped the parcel but I never received it and they did not answer to my last 2 mails.... I'm waiting for inline thermal sensors so... I'll have to mount them in the tubing that's why I'm waiting before beginning cable management.

So today I'm asking myself some questions:

- reservoir: I'm not happy with the EK Bay Spin reservoir because it's noisy (the flow indicator makes noise @ 290l/hour rate, and the water makes some noise when coming back into the reservoir from the top....). I'll probably plug the tubing on the bottom to avoid this unwanted noise (mechanical and water noise....). But I'll maybe swap with my Res 100 or Res 150 reservoir... I have both of them, and also a LINK option, I can stack both reservoir tube....

- pumps: I'll maybe separate the D5 pumps. I also have 2x D5 X Top Acetal in my ''stock'' and it could be a good idea to mount one D5 upstairs (behind the Aquaero controller) and the other D5 where the Dual are on the photo. And link the pumps with tubing. Removing one of the pumps from the bottom may ease the tubing and cabling management, also clear some more surface for air intake

- go for black: I'll contact Tom to confirm details about a modded TJ07 unit, powder coated with some tailor made parts. I don't want to make it myself because it's a lot of time and I don't like painting... (except for my house ^^).