Quote Originally Posted by Drwho? View Post
as I said in the past, i did rename this part 975 by hand, I did not want to call it 965 because it is a D stepping, and it would have been misleading. (It was a mistake, in the futur, I will call them "Intel Proto")

For the moment, the product group does not want to give time line on the release of the D stepping, I am not even sure that it will be called 975.

There is confusion between technology demo and productized CPU. It is fresh from the Fab.
Is there a general idea of release date? Q2? Q3? I just want to sell all my 8600's and 775 stuff before this comes out