Ok first, Vince Im glad you finally answered us
Now, good to hear the blocks will be ready
However, I have a question about the universal ASUS mosfet block, is it one-piece mosfet block ( L-shaped for both rows) or will I have to buy two blocks for the two rows of mosfets?
Thanks
looking forward to see those amazing blocks
BP-Vincent... Who are the US retailers for these items and on what date will we see them ?
Last edited by dengyong; 09-24-2008 at 06:20 PM.
Well at first guess I would say PPCS for sure.
BUMP! For date of availability?! To keep things on the safe side I'd like to buy by the end of this week. Thanks Vincent!
Finally...790i ready in this week...
All the models can be shipped out in next week...
N790NS
N79AP1
N79AP2
A790NS
AMOSI
Current production was very slow...all the materal jsut fit current order.
We do make those blcoks.
We need to make sure all the quality are under control and then we can tell all of the the exact date for availablity..
Sorry for the long waiting...
I thought you said BP was shipping the blocks this week and they were going to be ready FOR SALE next week...
Did you guys ever stop to think that with the rotary mess that the schedule got a tad screwed up? GEEZ, freakin' crack addicts.
Vincent, might I suggest that you no longer give ETA's on the products to save yourself some of this unnecessary harassment.
Circles SucQ!
If your annoyed by sigs telling you to put things in your sig, then put this in your sig
Bribery won't work on me...just say NO to AT!!!
Oh come on Waterlogged. You know how obsessive some people here get when it comes to watercooling. :P The guy is probably holding off his entire build waiting for those parts. Little frustration is understandable![]()
vincent i hate to bother you with this question,
but its been almost a month and no supply in the US.
Can you be frank with us, whats going on? And when will the US expect to have these in stock?
My project is held 1 month waiting for the 780i blocks, and honestly, its taking too long that i just went the DD route as a temp.
But we need an approx ETA. Cuz the guys in US have been waiting a very long time. :[
uhh... read my top comment WL. :\
Im dayam patient, but the lag on these parts in the US is almost on par as OCZ promising hydro-z. :X
Vincent i dont want to sound mean or rude, i just desperately need that block.
And at this point, im even calculating if a custom builder could make me my old design faster.
Well thats not the only thing. As i said, i decided not to have my block fabricated because BP was coming out with them. I thought i could just wait and ride it out.
However.... Look at the creation date, and then the last post. We been waiting a very long time. :P
Once again vincent i dont mean any rudeness, im just trying to meet deadlines.
Last edited by NaeKuh; 09-30-2008 at 10:42 AM.
Nadeshiko: i7 990 12GB DDR3 eVGA Classified *In Testing... Jealous?*
Miyuki: W3580 6GB DDR3 P6T-Dlx
Lind: Dual Gainestown 3.07
Sammy: Dual Yonah Sossoman cheerleader. *Sammy-> Lind.*
Its my fault.. and no im not sorry about it either.[12:37] skinnee: quit helping me procrastinate block reviews, you asshat. :p
[12:38] Naekuh: i love watching u get the firing squad on XS
Yes I do, because I'm the same way. you don't see me harassing anyone because I understand the manufacturing end of the business and know that things don't happen over night. Badgering someone for something isn't going to make it appear any faster. Patience Grasshoppers....patience.
Circles SucQ!
If your annoyed by sigs telling you to put things in your sig, then put this in your sig
Bribery won't work on me...just say NO to AT!!!
Im glad and happy I didnt have all my wc parts ready one month ago because I would be using something else by now, couldnt have waited 1 month for just a single part.
Im also waiting for another BP part which is sold everywhere in here, and hopefully are coming next week with the black freezers.
Seriously, I think ETAs should be given when the blocks are finally shipped from Taiwan, not before so this wont happen again.
I'm happy to wait for the rotaries to come back in stock, but I do get antsy every once in a while with all my rig on stock cooling on air.
I planned a lot of my build around those parts, so I'll just be patient and wait for them.
RIG 1 (in progress):
Core i7 920 @ 3GHz 1.17v (WIP) / EVGA X58 Classified 3X SLI / Crucial D9JNL 3x2GB @ 1430 7-7-7-20 1T 1.65v
Corsair HX1000 / EVGA GTX 295 SLI / X-FI Titanium FATAL1TY Pro / Samsung SyncMaster 245b 24" / MM H2GO
2x X25-M 80GB (RAID0) + Caviar 500 GB / Windows 7 Ultimate x64 RC1 Build 7100
RIG 2:
E4500 @ 3.0 / Asus P5Q / 4x1 GB DDR2-667
CoolerMaster Extreme Power / BFG 9800 GT OC / LG 22"
Antec Ninehundred / Onboard Sound / TRUE / Vista 32
usually we tell them to avoid ETA's, or give them ample room like an entire month. :P
But there can be delays, and making a block for mass production isnt easy as pie.
But i think theres more up. Because its not just the freezer blocks, its almost 2/3rd of there entire line thats up MIA and OOS in the US.
Nadeshiko: i7 990 12GB DDR3 eVGA Classified *In Testing... Jealous?*
Miyuki: W3580 6GB DDR3 P6T-Dlx
Lind: Dual Gainestown 3.07
Sammy: Dual Yonah Sossoman cheerleader. *Sammy-> Lind.*
Its my fault.. and no im not sorry about it either.[12:37] skinnee: quit helping me procrastinate block reviews, you asshat. :p
[12:38] Naekuh: i love watching u get the firing squad on XS
Exactly
They have two components that I need (and when say this, I mean I NEED) in order for me to start building my water cooling setup and start my project.
I seriously need this before Oct.10 or else Im going nutz. I been trying to build this since last week of july!!!![]()
I prefer to badger reps via pm our email. Sometimes the actual CEO of the company responds directly to my inquiry.
Lately that has happenned several times. I find that very comforting knowing these guys are so busy but take the time to directly answer my inquiries.
Sorry for everyone stressed out about builds for family, friends, clients etc.. but please relax. All good things will come!!
but I dont want to become a 80 year old grandpa while waiting!but please relax. All good things will come!!
RIG 1 (in progress):
Core i7 920 @ 3GHz 1.17v (WIP) / EVGA X58 Classified 3X SLI / Crucial D9JNL 3x2GB @ 1430 7-7-7-20 1T 1.65v
Corsair HX1000 / EVGA GTX 295 SLI / X-FI Titanium FATAL1TY Pro / Samsung SyncMaster 245b 24" / MM H2GO
2x X25-M 80GB (RAID0) + Caviar 500 GB / Windows 7 Ultimate x64 RC1 Build 7100
RIG 2:
E4500 @ 3.0 / Asus P5Q / 4x1 GB DDR2-667
CoolerMaster Extreme Power / BFG 9800 GT OC / LG 22"
Antec Ninehundred / Onboard Sound / TRUE / Vista 32
Well NaeKuh, as I stated before, things get thrown off schedule when an unforeseen problem, such as the "broken" rotaries, arise. Fixing the problem instantly becomes your first priority and other things take a back seat. If I had a dollar for all the times I had to re-setup (after taking that setup off only a few days before) a machine to fix someone else's mistake, I'd have quite a bit of cash. Now, I know there is very little chance of these blocks being run on the same machines but, it's pretty much the same thing as your attention gets distracted from what your supposed to be doing to fixing what was already done. When you finally get back to what your supposed to be doing, you get a little gun shy and take a bit longer making sure everything is right the first time. Then things start to flow like they should again and guess what?.....another screwup. It's almost as predictable as Old Faithful.![]()
Circles SucQ!
If your annoyed by sigs telling you to put things in your sig, then put this in your sig
Bribery won't work on me...just say NO to AT!!!
Here we have customer's oders already for those blocks..
But they not only order blocks but others items...We need to ship together with whole order out...
From the list I have on my hand now..next week will have all the blocks out...
Sorry for the long delay...
We are all doing all the new projects and solving the issue of our rotary models...
I have rejected those products twice time..because the quality was not what I need.....but now all can be closed to...and we will improve step by step.
When our production flow was ready...all new products will come out under control...
Please read my reply above...Just need to make sure the first one can be fit my expect and then we can ship out those to all of our customers.
I am very sorry for those blocks be delayed long time..
Bookmarks