is this controller good it holds 20 watts per channel:
Sunbeam 4 Channel Rheobus

and also
Quote Originally Posted by \/\/ater (ooler View Post
will the pump (MCP655) be efficient to run this loop:
MCR320 -> CPU -> MCR120 -> Mosfets -> NB -> SB -> MCP655?
or should i run the third loop on its own?