is this controller good it holds 20 watts per channel: Sunbeam 4 Channel Rheobus and also Originally Posted by \/\/ater (ooler will the pump (MCP655) be efficient to run this loop: MCR320 -> CPU -> MCR120 -> Mosfets -> NB -> SB -> MCP655? or should i run the third loop on its own?
Forum Rules
Bookmarks