Results 401 to 425 of 1243

Thread: Water cooling the Asus Maximus SE X38

Threaded View

  1. #10
    Xtreme Mentor
    Join Date
    Sep 2007
    Location
    Ohio
    Posts
    2,977
    I think for me living in Ohio, 2 week's is the very best I can expect, but thinking more like 3 to 4 weeks is probably more realistic? Not sure yet, as the delivery time reports posted, that were made to the US, are few and seem to vary in length.

    Heck, that is why I waited 27 days the first time before I started seeking conformation that my order had actually shipped.
    I should have checked sooner.

    Needless to say I am more than a little anxious to actually put my hand on The Mythical EK NB block.

    I have the CPU backplate that EK makes in the same order.
    I am guessing I should wrap a layer of black electrical tape around it before mounting?
    I am wondering how that will work out for me too, putting it on the back of the Maximus SE.

    Some day I will actually get to let my Maximus taste some power and boot. What a fun day that will be!

    At least the BIOS Updates keep being made...

    I do want to see how the new EK ring is looking too.
    Last edited by Talonman; 12-28-2007 at 09:47 AM.
    Asus Maximus SE X38 / Lapped Q6600 G0 @ 3.8GHz (L726B397 stock VID=1.224) / 7 Ultimate x64 /EVGA GTX 295 C=650 S=1512 M=1188 (Graphics)/ EVGA GTX 280 C=756 S=1512 M=1296 (PhysX)/ G.SKILL 8GB (4 x 2GB) SDRAM DDR2 1000 (PC2 8000) / Gateway FPD2485W (1920 x 1200 res) / Toughpower 1,000-Watt modular PSU / SilverStone TJ-09 BW / (2) 150 GB Raptor's RAID-0 / (1) Western Digital Caviar 750 GB / LG GGC-H20L (CD, DVD, HD-DVD, and BlueRay Drive) / WaterKegIII Xtreme / D-TEK FuZion CPU, EVGA Hydro Copper 16 GPU, and EK NB S-MAX Acetal Waterblocks / Enzotech Forged Copper CNB-S1L (South Bridge heat sink)

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •