The funny of the thing is that you didnīt came up with the numer but other user. And that number only came up today. Also you didnīt specify the % because you also didnīt know the number.
The fact here is that I put almost all info with a link attached and you spread BS and garbage with Astrological powers.
And 80% in this stage when 45nm are starting to come up itīs very plausible that they reach full capacity in very short time when 45nm K10 enter mass production. But AMD will give full details on this.
Yes it can be in 1-2 years because AMD is prepared the deal in Luther Forest back in 2006. This is not nothing that come up only today.Originally Posted by Shintai
By the pictures the NY Fab looks huge. It should be constructed/tooled gradually and upgraded through the time. 3-4 years is the number for the full Fab running. But in the mean time the Fab will be gradually producing chips.
Itīs also possible this cenario:
- Fab38 is tooled in 45nm and is the main 45nm Fab
- Fab36 sell 65nm equipment and tool 32nm equipment
45nm can bring AMD sales up because is a much better CPU -> sell more chips -> produce more chips -> Fab going to work on 80%-100%.Originally Posted by Shintai
And I asked if itīs possible. Itīs a question, not a statement. And I said also that is better wait for the new info about that.
On the other side you came with prety shure on about everything and spreading garbage on the tread again.
Go trolling to other side![]()
Bookmarks