Results 1 to 25 of 26

Thread: [Fudzilla]Ivy Bridge to launch in March / April 2012

Hybrid View

  1. #1
    Xtreme Member
    Join Date
    Aug 2009
    Posts
    253
    Going to from 32nm to tri-gate 22nm is like two die shrinks. I don't think they are slowing down

  2. #2
    Xtreme Member
    Join Date
    Oct 2005
    Location
    SF Bay Area, CA, USA
    Posts
    471
    Just wait for the 11nm shrink, things really are tough there, then to me all bets are off for anything lower than 11nm.

    RussC
    My Rig
    PII955-C2 3.8GHz, 2.5MHz NB
    GSkill 2x2GB DDR3-2400@900MHz
    M4A87T Antec 900 Case, Custom Mods x5Fans
    Custom Water Cooling: 15x12 3-Core Radiator
    4xSunon 4.5W Fans, DD12V-D5 Laing Variable Pump
    DD MC-TDX Water Block
    700W OZC ModX Power Supply
    GB HD6970OC2 Video Card
    2x150GB Raptor Raid

  3. #3
    Xtreme Addict
    Join Date
    May 2009
    Location
    Switzerland
    Posts
    1,972
    Quote Originally Posted by dartaz View Post
    Going to from 32nm to tri-gate 22nm is like two die shrinks. I don't think they are slowing down
    the slow down is for the release time, launching it in Q2 and not Q1 ... but as the new 3d gate involved in the production is a bit different of what have been used before, i will not say as Fudzilla Intel have decided to slow down the Tick/tock... itīs just in this case .
    CPU: - I7 4930K (EK Supremacy )
    GPU: - 2x AMD HD7970 flashed GHZ bios ( EK Acetal Nickel Waterblock H2o)
    Motherboard: Asus x79 Deluxe
    RAM: G-skill Ares C9 2133mhz 16GB
    Main Storage: Samsung 840EVO 500GB / 2x Crucial RealSSD C300 Raid0

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •