Got the rest of my supplies in today including the second pump. Here is the completed Assembly with the male to male rotary. I'm scraping the drive bay option as there just isn't enough room without turning everything sideways and using 90 deg adaptors.





I'm on my first beer, I'll post back later after I've done some case fitting, tube cutting, and leak testing. I'd say that should take 8 beers? lol