Well at least you got a lot of insight for the DDC version and maybe a D5 2.0 sometime down the road.
O, btw, I'm still waiting for my faceplate.![]()
Well at least you got a lot of insight for the DDC version and maybe a D5 2.0 sometime down the road.
O, btw, I'm still waiting for my faceplate.![]()
Project Millertime: The Core I5 build
Crunching/folding box on air: AMD Athlon X2 7750 Black Edition; Sapphire Radeon HD 4830; Gigabyte MA78GM-US2H; Lian Li PC-V351; Windows 7 RC
Order was placed and paid for on Wednesday the 19th and I was told manufacturing and shipping was about two weeks--so figure three to be safe and to allow some time to track down the double stick mounting and boxes...which puts them in resellers hands about...call it the end of the first week of September or so.
That of course is a best guess so no finger pointing if it is longer.
Project Millertime: The Core I5 build
Crunching/folding box on air: AMD Athlon X2 7750 Black Edition; Sapphire Radeon HD 4830; Gigabyte MA78GM-US2H; Lian Li PC-V351; Windows 7 RC
Bookmarks