Hello all andto my worklog!
Finished ordering all the parts for my new Core i7 build last night. The specs are as follows:
Hardware:
Main Components:
Case - Silverstone TJ07 (with window)
CPU - Intel Core i7 920
MOBO - Asus Rampage II Extreme
GPU - Zotac GTX 295
RAM - 6GB Corsair XMS3 DDR3 1333mhz (1.50v)
PSU - Coolermaster 1000w Modular
Storage:
HD MOUNTS - 3x AKASA AK-HD-03BK
DOWNLOADS DISK - 1x WD Caviar 1000Gb
OS/GAMES DISKS - 2x WD Raptors in RAID 0
OPTICAL DRIVES - 2x Pioneer 216DBK
Lighting:
4x Sharkoon CCFL WHITE lights
9x White/Grey Revoltec fans
Watercooling:
Loop 1 - CPU:
RAD - Thermochill PA120.2
PUMP - Liang DDC 18w
RES - XSPC DDC TOP RES
CPU BLOCK - EK Supreme
HOSE - XSPC Black 1/2" ID Hose
FITTINGS - 6x 1/2" ID Compression Fittings
COOLANT - 1L Feser VSC
Loop 2 - GPU:
RAD - Thermochill PA120.3
PUMP - Liang DDC 18w
RES - XSPC DDC TOP RES
GPU BLOCK - *pending*
HOSE - XSPC Black 1/2" ID Hose
FITTINGS - 6x 1/2" ID Compression Fittings
COOLANT - 1L Feser VSC
I ordered all the parts on 14/11/08 and they should be here on Wednesday, 19/11/08. I will probably take some pics of hardware on Wed but I doubt I will have time to start work until the weekend.
Please if anybody has any suggestions / ideas / examples that could help me with this build post them!
At the moment my biggest problem is where to put the pumps, any suggestions? I was toying with the idea of doing something like the following, what do you guys recon?
PIC1
PIC2
PIC3
PIC4
I have never used a TJ07 before and I am not quite sure how one would go about mounting the radiators in the bottom section? I have the HDD adaptors so I can use the whole of the space.
THANKS FOR LOOKING!
UPDATES:
15/11/08
1) I have now changed the Tygon 1/2" hose for XSPC of the same size, because the XSPC is black and much cheaper.
18/11/08
1) I have cancelled my watercooling order because there were too many changed I had to make and they will not allow one to make any modifications to an order where a voucher code has been used! Now I am in the process of waiting for confirmation from them and then I place another order when my full refund comes through.
2) I will no longer be using an AC Couplex waterblock for the CPU, some of you may have noticed that EK have brought out a 1366 adapter for their Supreme blocks. That is what I am going to be using instead because I already have one. Its not in tip-top condition but needs need a bit of lapping of which I will post some pics when I get round to doing it.
23/11/08
1) I Changed the ASUS RAMPAGE II x58 to an ASUS P6T Deluxe OC PALM x58 (anyone buying a P6T they are £50 cheaper at specialtech than overclockers and other retailers!)
2) I Changed the GPU block from an EK-FC4870 X2 to an XSPC Razor 4870x2 full cover block.
2) I Changed the coolant from Feser One UV Black to Feser VSC.
3) Mobo should arrive tomorrow, I will have it on air until I can get my case internals powder coated.
25/01/09
1) Gone back to the Rampage II Extreme
2) Changed the 4870x2 for a GTX 295
3) Using the triple loop for the CPU due to a leak.
4) Going to be watercooling the NB with EK waterblock.
5) Scrapping foam pads to support the pumps, going to be drilling some holes and using screws.




to my worklog!
Reply With Quote
















Bookmarks