Results 1 to 25 of 1745

Thread: Easynews goes down

Hybrid View

  1. #1
    XS WCG Hamster Herder
    Join Date
    Mar 2007
    Location
    Pacific Northwest, USA
    Posts
    2,389
    Quote Originally Posted by VietOZ View Post
    Phewwwwwwwwww ... look like my training with wifey paid off .. lolz ... very nice crunching Bob. I dont think I'll be able to keep up with Bob when he fills up his rack. If my breaker can hold up (or if I move) then I'll be able to match him .. but for now .. the max I can add is another quad.

    Just talked to the builder a couple days ago. Try to build a custom room (extra room) for all my rig in my new house... will have more details later next weekend .. hope it'll work out.
    It was a good crunching day for you too Viet.

    On the extra room, I'd have the contractor run at least 4 dedicated 20 amp circuits. It's a lot cheaper to do it now than later, if the house is a new build. Network cabling might not be a bad idea either. They might let you do it if you catch the house before they sheetrock it. Why at least four circuits? Three for crunchers and the fourth for utility operation, such as an additional room air conditioner. That was my thinking when I ran 4 circuits to the hamster barn....(the garage... ).

    No worries on keeping up. I'm pausing right now to clean up a few things, like my clocks, the rack configuration, and my credit card.....

    Bob
    If You ain't Crunching, you ain't Xtreme enough. Go Here
    Help cure CANCER, MS, AIDS, and other diseases.
    ....and don't let your GPU sit there bored...Crunch or Fold on it!!
    Go Here, Or Here

  2. #2
    Xtreme Cruncher
    Join Date
    Dec 2006
    Location
    Houston TX
    Posts
    708
    Quote Originally Posted by 123bob View Post
    It was a good crunching day for you too Viet.

    On the extra room, I'd have the contractor run at least 4 dedicated 20 amp circuits. It's a lot cheaper to do it now than later, if the house is a new build. Network cabling might not be a bad idea either. They might let you do it if you catch the house before they sheetrock it. Why at least four circuits? Three for crunchers and the fourth for utility operation, such as an additional room air conditioner. That was my thinking when I ran 4 circuits to the hamster barn....(the garage... ).

    No worries on keeping up. I'm pausing right now to clean up a few things, like my clocks, the rack configuration, and my credit card.....

    Bob
    Thanks for the great great infos Bob! I'll ask the builder about that this Tues.

    As for cleaning the CC, I did that bout 2 months now ... try to make it look good on my credit report so I can get the house

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •