Quote Originally Posted by TS_PHI_PERRY_78
Some more drooling over pictures The more i see the better it is. The DFI rep for europe says these boards should ship mid January in Denmark :banana4: :banana4:

http://www.tweak.dk/forum/thread.php...id=1&styleid=1
The board is packed with stuff. 6 usb, 2 rj45, 7.1 onboard...

I got a feeling this is gonig to be a smokin' board...

hm.... has a molex connector on the board...

Where can I preorder one from ...