Page 3 of 17 FirstFirst 12345613 ... LastLast
Results 51 to 75 of 406

Thread: Build Log: 100,000 PPD by 1/23/2011

  1. #51
    Fanboy of Good Products
    Join Date
    Oct 2008
    Location
    FL
    Posts
    4,050
    Good work. Be careful with that electricity
    Cruncher #1: EVGA Z68 FTW | i7-2600k @ 4.5 | 6GB Ram
    Cruncher #2: Supermicro Dual-Socket | 2 x 6-core Opterons | 4GB Ram
    Cruncher #3: 8-core Xserve 1,1

    T400 for non-crunching



    "But don't think you'll run me over - It's, ah, planting season here in Texas... and the farm is growing..." -Otis11 on crunching WCG

  2. #52
    Xtreme Enthusiast
    Join Date
    Jun 2008
    Location
    Northern Ohio
    Posts
    664
    Never measured the wattage they use, but what about a $20 box fan from target? Im sure the static pressure is not the best but...that's alot of fan none the less.


    Work/Game System - ~24/7 WCG
    ASUS P8P67 PRO / i7 2600k @ 4.1Ghz / Gigabyte Radeon HD5870 / 4x4GB Corsair Vengeance @ 1600Mhz 9-9-9

    HTPC -~24/7 WCG
    Gigabyte GA-Z68AP-D3 / i7 2600k @ 4.0Ghz / Sapphire Radeon HD5830 / 2x2GB Mushkin Enhanced Essentials @ 1333Mhz 9-9-9

    XS WCG Team Forum - http://www.worldcommunitygrid.org/

  3. #53
    Xtreme Cruncher
    Join Date
    Oct 2007
    Posts
    1,638
    I have one of those, and I keep meaning to put it on the kill-a-watt. I'll make sure I get around to that and post up some results.
    XTREMESupercomputer: Phase 2
    Live up to your name - November 1 - 8
    Crunch with us, the XS WCG team

  4. #54
    version 2.0
    Join Date
    Feb 2005
    Location
    Flanders
    Posts
    3,862
    don't know if you're aware but there's a new bios out for your board

    'Kompatibilität Westmere-EP verbessert'

    http://www.jzelectronic.de/jz2/index.php

  5. #55
    Xtreme Cruncher
    Join Date
    Oct 2007
    Posts
    1,638
    I can't check out that site... work network is blocking it I have tried the FB bios bios that @bios downloads with no luck.

    I found these files on the gigabyte.asia server:

    /FileList/BIOS/mb_bios_ga-x58a-ud3r_2.x_fb11.exe
    /FileList/BIOS/mb_bios_ga-x58a-ud3r_2.x_fb5.exe
    /FileList/BIOS/mb_bios_ga-x58a-ud3r_2.x_fb16.exe

    i'll give some of these a try because it would be really nice to get these UD3R rev 2.0's working (another 5 just showed up yesterday so i'm up to a total of 8 rev 2.0 boards.)
    Last edited by trn; 09-10-2010 at 10:47 AM. Reason: updated
    XTREMESupercomputer: Phase 2
    Live up to your name - November 1 - 8
    Crunch with us, the XS WCG team

  6. #56
    version 2.0
    Join Date
    Feb 2005
    Location
    Flanders
    Posts
    3,862
    09.09.10
    GA-X58A-UD3R rev2.0 - TestBetaBIOS Fc1
    1. Kompatibilität Westmere-EP verbessert
    good chance it might fix your issues

  7. #57
    Xtreme Cruncher
    Join Date
    Oct 2007
    Posts
    1,638
    Excelent!! i'm going to try that out as soon as I get home

    *edit: I just went over to cruise the unofficial x58a-UD3R thread here in the Intel sub-section and found this:

    http://www.xtremesystems.org/forums/...&postcount=276

    hicookie (from Gigabyte) posted a response to my problems (with the same Bios that Jaco linked.) So a big for Gigabyte and their community members!

    Made my day, I was a bit bummed to find out that the Enzotech CPU blocks were not in stock at my favorite local online retailer and they had to drop ship them ground from California which means mid next week delivery instead of today or yesterday oh well... I can find other stuff to work and not rush the rest of the build too much.
    Last edited by trn; 09-10-2010 at 11:07 AM.
    XTREMESupercomputer: Phase 2
    Live up to your name - November 1 - 8
    Crunch with us, the XS WCG team

  8. #58
    Registered User
    Join Date
    Apr 2010
    Location
    NC
    Posts
    389
    Quote Originally Posted by trn View Post
    2) Started to build my Radiator housing today, the Radiators are going to be mounted horizontally just like shown; fans will be in the top of the box, and there will be a shroud to exhaust the hot air out the window below the radiators.
    I've been reading this thread with fascination and thought of something that *might* save you some electricity.

    If you built something like a chimney and vented it into your attic, the updraft of cooler air from the floor might be enough airflow to keep things cool. You could use the styrofoam sheeting that is used under siding to make it lightweight and inexpensive. Of course, how well it would work would depend on how well your attic is ventilated.

    Even if you still needed a fan for extra oomph, you wouldn't have to worry about water coming through the window and you'd have more flexibility on the placement.

  9. #59
    Xtreme Cruncher
    Join Date
    Oct 2007
    Posts
    1,638
    Quote Originally Posted by pirogue View Post
    I've been reading this thread with fascination and thought of something that *might* save you some electricity.

    If you built something like a chimney and vented it into your attic, the updraft of cooler air from the floor might be enough airflow to keep things cool. You could use the styrofoam sheeting that is used under siding to make it lightweight and inexpensive. Of course, how well it would work would depend on how well your attic is ventilated.

    Even if you still needed a fan for extra oomph, you wouldn't have to worry about water coming through the window and you'd have more flexibility on the placement.

    Thats a very interesting concept and I think it would work very well in cold climates. I was inspired by others mass water cooled build logs and am modifying the projects I've seen to fit my needs. Living in South Florida i'm planning for year round hot environment running. I'm going for a decent amount of fan firepower to turn over the air in my garage every few minutes or so and keep my garage temperatures under control. I plan on removing the weather stripping from the top inside edge of my garage door this weekend for an air intake. That should be ~20' x 1" so enough intake for sure.

    My attic temperatures FL sun all day long. This is what i'm planning to deal with year round:

    January 74.5 F
    February 75.3 F
    March 79.3 F
    April 82.5 F
    May 85.7 F
    June 88.1 F
    July 89.7 F
    August 90.1 F
    September 88.4 F
    October 84.4 F
    November 79.6 F
    December 75.7 F

    Constantly hot but never in the 100's.


    I do expect my build to be energy efficient per point. If I run a computer in my house and it dumps ~150w of heat into my home then mostly year round thats 150w of energy I have to remove with AC so I get hit twice with the power usage. With 7 hexacores going (and a lot at stock) they dump a large amount of heat into my house. By not having to pay for the extra AC to remove the heat and dumping the heat directly outside I expect to be "energy efficient per point."
    XTREMESupercomputer: Phase 2
    Live up to your name - November 1 - 8
    Crunch with us, the XS WCG team

  10. #60
    Xtreme Member
    Join Date
    Jun 2010
    Location
    Crab Nebula
    Posts
    493
    I plan on removing the weather stripping from the top inside edge of my garage door this weekend for an air intake. That should be ~20' x 1" so enough intake for sure
    That will also leave a 1 inch gap for critters to get in. You know how they are if you live in Fla.



    You'll never know what you're living for until you know what you're willing to die for.

  11. #61
    Xtreme Legend
    Join Date
    Mar 2008
    Location
    Plymouth (UK)
    Posts
    5,279
    Is it windy where you are?

    I was thinking of buying/building a flettner style roof vent or two

    Q2. have you got a garage wall in direct sunlight that you could adapt to passive cooling?
    Last edited by OldChap; 09-10-2010 at 01:55 PM.


    My Biggest Fear Is When I die, My Wife Sells All My Stuff For What I Told Her I Paid For It.
    79 SB threads and 32 IB Threads across 4 rigs 111 threads Crunching!!

  12. #62
    Xtreme Cruncher
    Join Date
    Oct 2007
    Posts
    1,638
    Time for a project update:

    First of all:

    Thanks to Slaveondope for providing 2 hard drives

    I worked today on the electrical for my farm. And first of all thanks to [XC] Hicks121 for the advise and help on the electrical work

    The electrical was on of the more intimidating and tough things on my check list. It was a hard sweaty dirty day of work in the garage and attic to get this done. I think I drank and sweated out 4 liters of water just today; mix that with digging around in fiberglass insulation and just all the other sorts of dirt and grime that comes from manual labor and I needed a nice long shower at the end of the day today. I have much respect for the people that do this every day!

    Starting; the plumb lines will be the conduit lines. I am running 4 120v 20amp lines to quadplex outlets. The blue tape represents my ceiling joist:


    I'll skip all the grimy work and just get to the good stuff Heres my first outlet up and running, thanks to a good walk through from Hicks everything went really smooth; I didn't have to redo anything or stop working to go buy more electrical equipment.


    Heres a preview of the final product: Only the 4th line is live right now and I still need to add a few wall straps to the conduit; easy work for tomorrow:


    This is how I left my panel for the night. The sun was starting to set so I didn't wire lines 1, 2, and 3 at the panel; I taped them off for the night and labeled them. More easy work for tomorrow.


    Well; thats progress for the day. I changed from my original plan of running 240V lines and sticking with 120V. I lose a % or two of PSU efficiency but I can buy off the shelf surge protectors and UPS's with 120V. My power has been very stable here recently but sometimes lightning storms can cause brown outs or short power outages so it would be nice to have the farm all on UPS's eventually to keep running through a brownout or 15 second power outage.

    I've been messing around with Linux some at night and really struggled with Xorg config; the new 1.8 config file system . Making me rethink my plan of installing Linux on all the new computers i'm adding. Maybe I just need to bite the bullet and give ubuntu server a go. With my Linux boxes I plan on running Boinc as a daemon and doing most admining from the console (I've found CPU usage looks to be a few % better without X or boinc manager or any WDM running also and X is probably the weakest link on any Linux computer.) But X and a VNC client is needed because boinccmd (command line manager) just sucks! More to come on this later; but i'm think 50% Windows and 50% Linux might be a good mix of rigs.

    My x58a-UD3R Rev 2.0 Westmere A0 woes are over; the new Fc1 (beta FC bios) works great and I have two rev 2.0 boards up and running with L5640s and the same bios settings as my rev 1.0 boards.

    More toys have been showing up with a few more simple things on the way. I have a small pile of mcp655's, UD3R's, PSU, networking equipment behind me now. Thats all for now; off to see Inception now (which I missed when it came out on Imax being away from home.)
    XTREMESupercomputer: Phase 2
    Live up to your name - November 1 - 8
    Crunch with us, the XS WCG team

  13. #63
    Devil kept pokin'
    Join Date
    Jan 2010
    Location
    South Kakalaky
    Posts
    1,299
    Quote Originally Posted by trn View Post
    Time for a project update:

    First of all:
    *snip
    Thanks to Slaveondope for providing 2 hard drives
    Glad to help I take it they survived shipping.

    Looks like things are coming together nicely, now treat yourself to a bear

  14. #64
    Xtremely High Voltage Sparky's Avatar
    Join Date
    Mar 2006
    Location
    Ohio, USA
    Posts
    16,040
    I thought you were going with 240V, for that small efficiency bump?
    The Cardboard Master
    Crunch with us, the XS WCG team
    Intel Core i7 2600k @ 4.5GHz, 16GB DDR3-1600, Radeon 7950 @ 1000/1250, Win 10 Pro x64

  15. #65
    Xtreme Cruncher
    Join Date
    Oct 2007
    Posts
    1,638
    Quote Originally Posted by slaveondope View Post
    Glad to help I take it they survived shipping.

    Looks like things are coming together nicely, now treat yourself to a bear
    I liked the "newegg" packaging I havn't had a chance to check em out yet (and see what kinda naughty files you might have stored on them )

    Quote Originally Posted by Sparky View Post
    I thought you were going with 240V, for that small efficiency bump?
    Change of plan; it was UPSs that made my decision and just sticking with the plain conventional US power. Eventually I would like to have enough UPS's to keep the farm (and water cooling) up and running through brownouts or short power outages. Sometimes I travel a lot so long term stability is a goal of mine.

    Something like 123bob's setup (behind the chair) would be nice.
    XTREMESupercomputer: Phase 2
    Live up to your name - November 1 - 8
    Crunch with us, the XS WCG team

  16. #66
    Xtreme Member
    Join Date
    May 2009
    Location
    middle of no where called evansville in
    Posts
    345
    very nice
    cant wait to see this thing done and up and running

  17. #67
    Back from the Dead
    Join Date
    Oct 2007
    Location
    Stuttgart, Germany
    Posts
    6,602
    Nice work on the electrics trn
    By the way, I had no trouble whatsoever setting up the UD3R Rev. 2 with an i7 930 and FB bios, so the board itself is fine, just need a bios fix for Westmere

    On another note, are you sure you want to go with Enzotech blocks? They kind of have a history of breaking and/or leaking...
    Not sure what the prices are like for you US guys, but over here EK Supreme HF and the Heatkiller LT are not only the best but also the cheapest blocks around.
    World Community Grid - come join a great team and help us fight for a better tomorrow![size=1]


  18. #68
    Xtremely High Voltage Sparky's Avatar
    Join Date
    Mar 2006
    Location
    Ohio, USA
    Posts
    16,040
    Quote Originally Posted by trn View Post
    Change of plan; it was UPSs that made my decision and just sticking with the plain conventional US power. Eventually I would like to have enough UPS's to keep the farm (and water cooling) up and running through brownouts or short power outages. Sometimes I travel a lot so long term stability is a goal of mine.
    I see. Understandable. The 240V UPSes can be very expensive.
    The Cardboard Master
    Crunch with us, the XS WCG team
    Intel Core i7 2600k @ 4.5GHz, 16GB DDR3-1600, Radeon 7950 @ 1000/1250, Win 10 Pro x64

  19. #69
    Hamster Powered
    Join Date
    Apr 2006
    Location
    Virginia, USA [Krunching since 2001]
    Posts
    7,623
    Great project and a lot of hard work, bravo sir!
    XSWCG Disclaimer:
    We are not responsible for the large sums of money that you WILL want to spend to upgrade and add additional equipment. This is an addiction and the forum takes no responsibility morally or financially for the equipment and therapy cost. Thank you and have a great day.

    Sigmund Freud said... "Failure to CRUNCH is a sign of Sexual Inadequacies".

  20. #70
    Xtreme Cruncher
    Join Date
    Oct 2007
    Posts
    1,638
    Quote Originally Posted by jcool View Post
    Nice work on the electrics trn
    By the way, I had no trouble whatsoever setting up the UD3R Rev. 2 with an i7 930 and FB bios, so the board itself is fine, just need a bios fix for Westmere

    On another note, are you sure you want to go with Enzotech blocks? They kind of have a history of breaking and/or leaking...
    Not sure what the prices are like for you US guys, but over here EK Supreme HF and the Heatkiller LT are not only the best but also the cheapest blocks around.
    FA bios was garbage for my B1 gulftowns, entering the M.I.T. menu in in the bios would cause the bios to lock. FB works fine but no luck with the A0's; and the Fc1 works good with the A0 bios; so they just needed a bios fix for my Q3NC's; retail stepping seem to work fine with the FB bios . Anyways; i'm happy to see that Gigabyte released a fix so quickly; makes me wonder if they patched the bios just because I let them know (I can't imagine too many people having problems with their Q3NC's; must be a rare combo.) So another for Gigabyte.

    I went with the Enzotech blocks already At this point I'll just have to make sure I do a good 12h+ leak test; thanks for the heads up I didn't know of quality issues with the Enzotech's. Pricing was good, with mounting bracket they cost $47 vs $75 for a Heatkiller or EK; those savings add up when the quantities are large. I also heard the sapphire blocks are very low restriction blocks which I was looking for. I plan for each sub-loop to go through 3 blocks then back to the res > rad > rad > res with a mcp655 (like Fallwinds farm but with an extra rad and more tubing.)
    XTREMESupercomputer: Phase 2
    Live up to your name - November 1 - 8
    Crunch with us, the XS WCG team

  21. #71
    version 2.0
    Join Date
    Feb 2005
    Location
    Flanders
    Posts
    3,862
    Now there's also a new bios for my UD4P with better Westmere compatibility
    Probably fixes the issues with my A0 too.

  22. #72
    HARD CRUNCHER!!
    Join Date
    Nov 2006
    Location
    Chicago
    Posts
    1,787
    Hey brother! Glad everything worked out for you. I was expecting a call yesterday...lol....It looks really good.
    Quote Originally Posted by mike047 View Post
    CRUNCH HARD, it may not help me and you, but it might help the Kids.

  23. #73
    Xtreme Cruncher
    Join Date
    Oct 2007
    Posts
    1,638
    Quote Originally Posted by [XC] Hicks121 View Post
    Hey brother! Glad everything worked out for you. I was expecting a call yesterday...lol....It looks really good.
    Knowing what components to buy ahead of time made the electrical work go smoothly. Once I know I had all the right stuff its just a matter of making it all fit together

    Todays Update:

    Finished the wiring in the morning and got the panel back together. All 4 outlets worked right the first time; I didn't have to go back and rework anything thankfully. The top right 4 breakers are the ones I installed; 4 20amp breakers.


    Shelves in place with the rad holder in place at mid-day; I ran an internet cable this morning also which is just dangling above my racks to be plugged into a switch that will go on the top shelf.


    I soaked the rads with a ~50/50 Water Vinegar mixture last night; so this morning I gave them a good final flushing with the garden hose. Unfortunately I could not find a local shop that would soak and flush the rads so I had to do it the hard-way but they are good to go now.


    I ran the plumbing to the the rads and reservoirs for a leak test. Unfortunately I failed that test miserably . The first joint I filled to where the small piping intersets the 4" PVC piping leaks bad so I stopped the test right there and drained down to that point. No suprise that those joints leak, I had to do some custom dremel work at for those holes. If I was to do that again I would look for a brass connector with threads that I could tap into the PVC piping for a more secure fit. Tomorrow i'll go back over the top of all the joints were the small piping meets the 4" piping with another 2 layers of 'goop' and hope that does the trick.


    I'll post up some more detailed pics of the WC setup once I get my leaks solved.
    XTREMESupercomputer: Phase 2
    Live up to your name - November 1 - 8
    Crunch with us, the XS WCG team

  24. #74
    Xtreme Member
    Join Date
    Aug 2010
    Location
    perth, west oz
    Posts
    252
    wow, that is commitment!

    Excellent work.

    Speaking of electics...anyone thought of using Solar power, in particular in a place like Florida?

    Henrik

    A Dane Down Under

  25. #75
    Xtreme crazy bastid
    Join Date
    Apr 2007
    Location
    On mah murder-sickle!
    Posts
    5,878
    There's a whole thread on it here somewhere.

    [SIGPIC][/SIGPIC]

Page 3 of 17 FirstFirst 12345613 ... LastLast

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •