Heh.... Make note of the ETA for the nozzles. I added them to the site when D-TEK first told me they would be coming "soon". Since then they've been coming "soon", so I haven't removed it...
They have still not arrived though.
Printable View
Heh.... Make note of the ETA for the nozzles. I added them to the site when D-TEK first told me they would be coming "soon". Since then they've been coming "soon", so I haven't removed it...
They have still not arrived though.
when u bow a fuzion which o-ring do you replace with new one the bottom one near copper base or top one???
does the bowing improve quad cooling as well or is it good for dua lcores only
link to the guide's on bowing the d-tek fuzion?
nice work :up:
Edit: Never mind I miss read the email. They are still back ordered. If a moderator could delete this post that would be great.
any updates on ETA?
--pak
i hate this crap these nozzles are holding my build up i need some
I was talking to tricia @ radiical.com.au the other day and they said they will be expecting the nozzle's and new unisink withing the next 2 weeks.....Quote:
i hate this crap these nozzles are holding my build up i need some
so i assume they coming very soon....
thats way out australia tho i live in usa east coast
hope pts gets some in stock soon i have to wait on the dcc3.2 to get instock @ svc ( the site says available but of course not in stock when i order ) so i have time to wait on nozzles to get to the e-tailers, anyone know why there is a delay?
delay is first set didn't pass quality check.
--pak