Quote Originally Posted by shazza View Post
I think you are past this, but I am still puzzling over what you mean?
I am past the thought of worry in the matter.

My thoughts were the key hardware needs to be installed with blocks so I can get the proper lengths of tubing cut. After that point my thoughts were to remove the blocks and pull the hardware out: mobo and gpu. Then run the pumps to check for leaks.

I believe I can leave the hardware installed though with no power to them while the loops are being tested a few days for leaks. That way all they have to do is dry out a couple of days if a leak springs up.

I can't do any of this though until mid next week when my lapping kit arrives. The replacement resistors I would think should arrive tomorrow since I paid extra for priority mail and they were shipped on the 12th.
Hopefully out of 10 resistors I'll get one soldered on without loosing it. LOL