Hi all,
I will soon make my first H2O try wit ha Maze 3 setup.
I will order a Maze 3 ,Northbridge block ,GF4 block, Aqua pump ,Cooling cube with 2 120mm Papsts. I will fit this into a fulltower chieftec and i might need some guidance on how and in which order.
Let say the cube can fit into the top 2 or 3 hd bays, would that be the best place for the rad?
Also, should the cpu block be the first to be cooled?
Let say i bough a maze 3-1, would i get the same result with that even if i DONT use pelt?
Any help would be really appreciated!
Mac
Bookmarks