Originally Posted by JumpingJack
Nobody noted, but the engineering sample stepping is 1, as opposed to prescott ES steppings of 3 or 4 some years ago. Intel made a functional process on the first stepping!!! Booting windows and yielding jaw-dropping benches...
Actual production steppings will likely be 2 or 3, which means they will have tweaked out RC delay loops, optimized power layouts slightly, and shorten critical paths not to mention optimize processing parameters.
The production samples will likely come out of the gate performing slightly better than what we have seen. Perhaps 1-5%.