looks awesome man, its in order too unlike some other cascades weve seen that were just aprawled out all over a cart
i like the light switches :D
Printable View
looks awesome man, its in order too unlike some other cascades weve seen that were just aprawled out all over a cart
i like the light switches :D
very nice and good luck
Thanks Guys,
It's Easier for Me to work on When I Arrange Everything so that I can see what's Going On, Also Troubleshooting/Changing the System Doesn't Take Forever to Complete! ;)
Quote:
Originally posted by hallowen
You Should NOT have to be a Member To View It, Only to Post!:cool: [/B]
The attached is where your link leads....
I think there is an issue with the websites coding I know there was problems with the site that are being worked on...
I really dont even know what a cascade is (id love to learn but I dont think i have the science or math skills) but that sure does look beautiful...nice work.
_Siph
I Have started to Insulate my chilly1 Spiral CPU Evap and Baker Block GPU Evap.
I Modified a Vapochill Hold-Down for the Cpu, and used a Modified Danger Den V.C. Water Block Top For a Gpu Hold Down for my 9800XT (A 9700Pro Is Being Shown for a "Mock-Up" until I Transfer It!
I will Fully Insulate Everything on Both when I Attach Them to the Cascade. :banana:
A Few Pics:
next
also
and
finally
Insulation on your hoses is much to thin... Make it ~2cm thick (3/4 - 1")
it is very thin...have u tried the evap by self?...it seems awsome
As I Previously have Stated...:DQuote:
I will Fully Insulate Everything on Both when I Attach Them to the Cascade. :banana:
I Just wanted to show you the Details before I Cover Everything Up..................
I Still have to install the CPU Evap/PEV and Pressure Test It BEFORE I Complete The Rest Of The Insulation.;)
oh...hmmm..ur evaporator...looked like it already had some insulation wraped on it..wat is it?
Just have Some Foam Insulation Tape Around the GPU Baker Block Evap, and Some 1/2" Pipe Insulation Over The chilly1 Evap Hose ATM.
I'll be adding at LEAST another 1/2" on Everything(more than Likely 1" More!) when Installed and Finished.:cool:
man...ur evaps...look so neat..awsome!
Here's some Pic's of the PEV Installed and The Whole Second Stage is being Pressure Tested @250psi Nitrogen.:)
And
:banana: :banana: :banana: :banana: :banana: :banana: :banana:
nice !
ah..wow, congrats!
Congrats.....
I'm Going to Put My 3.2E ES under the Cascade and Run Some Benches as Soon as I Finish the Hold-Down For the MoBo and see what It does Under Load.:D
NEXT PROJECT!
Attach A THIRD Stage and Shoot For -150C!........ :slobber:
Right, Chilly1?
:toast:
We are in the process of figuring out how to achieve -150...