I used a wet flame retardant rage and some wet rages to keep the head element cool.
http://www.public.iastate.edu/~nknau...ct%20(251).jpg
With the new valve in I tube them also.
http://www.public.iastate.edu/~nknau...ct%20(253).jpg
I put a pressure tape in so I could check my liquid line pressure before the TXV valves.
http://www.public.iastate.edu/~nknau...ct%20(254).jpg
http://www.public.iastate.edu/~nknau...ct%20(255).jpg
The system is setting tonight with 300 psi on it to help check for leaks. I did find 4 leaks this time before leaving for the night. I think I found them all.
I'm hopping to run the 1-Stage tomorrow. I can't wait to see if I hit the temps I'm looking for.